| Asset: | SELH (Solimar 100%, Operator) | ||
| Location: | Central San Joaquin Basin on the south east plunge of the giant Lost Hills field anticline. | ||
| Description: |
|
||
Technical: |
Shallow (2,000 to 4,000 ft), Pliocene gas accumulation on the plunge of the Lost Hills regional anticline. Gas dry and possibly biogenic. Mainly contained in thin (<25 ft), fine grained silty sands with strong stratigraphic control of the trap indicated. Solimar has a +5 mmcfd capacity gas plant on site connected by Solimar owned pipeline to a gas export trunkline. A gas sales agreement is in place with a large gas producing company. Gas previously production tested by SGY from the Jack Hamar 3-13 (two zones) and Jack Hamar 2-13 wells that were drilled by a prior operator and re-entered and tested by Solimar. The 3-13 well produced gas over a 6 month period at an average of 300 mcfpd. Solimar owns 4 suspended well bores (2-13, 3-13, 4-13 and 1-24). Target resource 40 bcf recoverable gas. Upside 100 bcf. |
||
Forward Plan: |
Complete testing program of the re-entered the 1-24 well and drill new appraisal well. |
||